Slope and Drainage Rehabilitation- RR73 and TWP 493

Town of Drayton Valley

The work was completed on the east side of the road at RR73 and TWP 493. The work consisted of site preparation, topsoil stripping, excavation, manhole installation, culvert installation, roadway work, erosion & sediment control, topsoiling & seeding and rip rap installation.

Parkway was able to complete this job safely and efficiently and on budget while minimizing interruptions to residents.

Town of Drayton Valley
$242,738.70

Total Contract Price

14

Work Days

457.5

Man Hours

0

Incidents